1, The modeling of the cooling water system.
2, A week to check the pipes and pipes, tubing and circuit connection is loose.
3, A week, check the anchor bolts and drive fasteners.
In January 4, to assist electrical cabinet dust blowing.
5, With the cast tight joint, do not need to notify the other sand bucket to avoid long time to dry sand.
6, Endanger the safety of life or equipment damage when the red press the emergency stop button.
7, Molding machine equipment operation appears abnormal pause, according to the stop and then see the fault query.
8, Molding machine failure must notify the electric furnace and sand.
9, Before work must be poured out of box type casting area, in order to avoid the next class when the other sand falling sand. Clean out the shape of the regional health to prepare enough sand core, release agent (kerosene) and other auxiliary materials to fill in the delivery of the record clearly behind the work.